![]() Then pull vents two, three and four down. The top vent snaps into the metal clips at the top of the frame very tightly. Step 8: Once installed, push all four vents up to the top of the unit to fully engage the top vent. Each panel is completely custom built to fit your openings. Units greater than 54” wide require additional fasteners at head and sill to prevent sagging and twisting of frame. Eze-Breeze is the most trusted porch and deck enclosure system for creating functional spaces from outdoor places. Step 7: If your unit is wide enough to require a spreader bar, place on additional fastener at the head and sill in line with the spreader bar. Step 6: Remove plastic vent spacers and discard. For units with four vents, repeat this process one more time to locate and place third and final jamb fasteners (D). Locate the top rail of the bottom vent, place a fastener through the flange adjacent to that rail on each side (C). Architectural Glass is excited to offer you the EzeBreeze Sliding Panel System as a complete Do It Yourself EZE-Breeze Porch Enclosure System. Step 5: Leaving the plastic vent spacer in place, one at a time raise all the vents until the bottom rail of the lowest vent is even with the previously installed fasteners. Step 4: With vents in the open position, locate the top rail of the bottom vent, and place a fastener through the flange adjacent to the rail on each side (B). Important: Maintaining plumb, level, and square during installation is essential to the proper operation of the unit. Level the unit and fasten the remaining three corners (A). ![]() Center and square the unit in the opening and fasten one of the top corners, through the flange, to the substrate. Tep 3: Open vents so they are all stacked at the bottom of the unit. Step 2: Remove unit from opening and caulk the outside perimeter of opening and along the joint where the horizontal member meets the vertical upright post with the appropriate, approved sealant. When measuring a whole room, start at one end and work your way around the room, numbering each opening in sequence. Also, for INSIDE mount windows, there are special considerations that have to be made in the corners ( see document ). ![]() Step 1: Dry fit unit into opening to ensure proper fit and operation before applying any sealant. Make sure you have a minimum of 2 full inches between windows. Do not remove these clips until installation is complete. Note: This unit has been shipped with plastic spacers positioned at the left and right sides of the top vent, adjacent to the vent latches, to help maintain proper vent clearance during installation. The space between the main frame and the substrate framing is to be dressed out with a thin bead of sealant after installation. Outside Mount: Is designed to fit tight within the opening from the outside with no interior trim.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |